Exposed steel beams and columns in a converted Liberty Village office were primed and sprayed with a listed intumescent system for a 1-hour rating, with a decorative black topcoat to keep the industrial look.
Intumescent Fireproofing Toronto Fire-Rated Steel Coating Contractors | Toronto Spectrum Commercial Painters
UL and ULC rated intumescent coatings on structural steel, with DFT sign-off.
Get a Fixed-Price Intumescent Quote
Free site walkthrough. Estimator reply within 2 business hours.
Intumescent Fireproofing Before and After: Recent Toronto Projects
Real intumescent fireproofing work by our Toronto crews. Same building, same angle. Drag the handle to compare.
Intumescent fireproofing lets exposed structural steel stay exposed and still meet its fire rating. When heated, the coating swells into an insulating char that slows how fast the steel heats up. Our intumescent fireproofing crews apply listed systems to columns, beams and exposed steel for 1, 2 and 3-hour ratings, measure wet and dry film thickness on every member and hand over a documented log for the inspector.
Intumescent fireproofing in Toronto runs $8-$25/sqft + HST. The price depends on the required rating, the steel section size and the dry film thickness the listing calls for. Every quote is fixed-price and written, naming the listed system, primer, topcoat and the thickness schedule from your design.
How Much Does Intumescent Fireproofing Cost in Toronto?
Intumescent Fireproofing runs $8-$25 per sqft + HST. Price depends on rating and dry film thickness.
2-hour rating
$12-$18/sqft
- Thicker build, multiple passes
- Decorative topcoat
- Member-by-member readings
- Inspector handover file
3-hour rating
$18-$25/sqft
- Highest build listed systems
- Heavy sections and columns
- Blast prep where required
- Extended cure scheduling
Fixed-price written intumescent fireproofing quote: the approved number is the invoice number unless you sign off on a scope change. All prices + 13% HST.
Try the cost calculatorHow Intumescent Fireproofing Works
Structural steel loses strength quickly in a fire. Intumescent fireproofing protects it with a thin-film coating that reacts to heat. At high temperatures the coating swells, often many times its applied thickness, into a carbon char that insulates the steel. That char expansion slows the steel temperature rise and buys time for people to get out and for firefighters to work.
Because it goes on like paint, intumescent fireproofing lets designers leave steel exposed in offices, retail spaces, atriums and converted warehouses, where bulky cementitious fireproofing would hide the structure.
Ratings, Standards and Thickness
The required fire endurance rating comes from the Ontario Building Code and your design documents. Products are tested to ULC S101 in Canada, and many also carry UL 263 listings. Each listing ties the rating to a dry film thickness that depends on the steel section factor: thin, heavy sections need less coating than light, thin-walled sections for the same rating.
| Rating | Typical build | Typical cost |
|---|---|---|
| 1 hour | Thin film, one to two passes | $8-$12/sqft |
| 2 hours | Thicker build, several passes | $12-$18/sqft |
| 3 hours | Highest build listed systems | $18-$25/sqft |
Our Intumescent Fireproofing Process
- Review the schedule: confirm the rating, listed product and thickness for every member from the design.
- Prep the steel: clean and prime with a compatible primer; blast rusted or mill-scale steel to an SSPC standard first.
- Apply in passes: spray with a high-ratio airless pump, checking wet film thickness as we go.
- Cure and measure: check dry film thickness with a gauge on every member and log the readings.
- Topcoat: apply a manufacturer-approved decorative or protective topcoat.
- Hand over: product data, listings, thickness logs and photos go to you and the inspector.
Fireproofing tip
Ask for the thickness log on every intumescent job. If readings were not taken and recorded, there is no proof the coating will perform as listed.
Where We Apply Intumescent Coatings
- Exposed columns and beams in offices and lofts
- Retail renovations with exposed structure
- Warehouse and plant mezzanines
- Atriums, lobbies and institutional buildings
- Steel added during renovations that needs a rating
Converted brick-and-beam offices in King West and Liberty Village and retail renovations in Downtown Toronto are typical projects.
Prep and Related Services
Rusted or mill-scale steel is prepared through industrial sandblasting. Plant steel that needs fireproofing alongside corrosion coatings is often scheduled with factory and industrial painting in the same shutdown, and warehouse mezzanines with warehouse painting.
Why Contractors and Owners Choose Our Intumescent Fireproofing Crews
We apply listed systems only, measure every member and hand over a complete file. Our crews carry lift and scaffold tickets, WSIB, $5M liability and $2M pollution coverage, and work after hours in occupied buildings. Specialty coatings carry our 3-year workmanship warranty. That is how our commercial painting contractors in Toronto run every project, large or small.
Why Property Managers Hire Us for Intumescent Fireproofing
Four reasons property managers and operators book our intumescent fireproofing crews across Toronto and the GTA.
Listed systems only
We apply products listed for your rating and steel section, per the design schedule.
Every member measured
Wet and dry film thickness readings logged on each column and beam.
Inspector-ready file
Product data, listings, thickness logs and photos handed over at completion.
Looks like architecture
Smooth finish and decorative topcoats keep exposed steel as a design feature.
How Our Intumescent Fireproofing Process Works
Every intumescent fireproofing job follows the same six steps, from the free walkthrough to the warranty certificate.
Small exposed-steel areas take a few nights. Larger programs depend on thickness and passes; 2 and 3-hour ratings need several coats with cure time between.
- 01
Site Walkthrough
Day 0, freeAn estimator measures, photographs the surfaces and talks through your schedule, finishes and access rules.
- 02
Written Quote
Day 1-3Fixed price with product spec sheets, a disruption plan, insurance documents and a timeline you can take to your board or owner.
- 03
Contract + Deposit
Day 3-7A 25% deposit secures the start date. Scope, products, finish and warranty are named in the contract.
- 04
Pre-Job Protection
Day 1Floor protection, HEPA air scrubbers, equipment moved or covered and tenant or staff notices posted.
- 05
Painting Execution
DailyA signed daily job log, after-hours check-ins with your keyholder and dustless prep wherever it is required.
- 06
Walkthrough + Warranty
HandoverPunch-list walkthrough, warranty certificate and a Net 30 B2B invoice that matches the approved quote.
Free walkthrough, fixed-price written quote, no obligation
Written intumescent fireproofing quote within 72 hours. $5M liability and WSIB on every job.
Intumescent Clients on Schedule, Quality and Cleanup
"Mississauga DC full repaint around 24/7 shipping. Finished ahead, no shutdown."
"After-hours office repaint, three floors King St. Fri 7pm to Mon 5am. Invoice matched quote."
Intumescent Fireproofing Cost, Timing and Scheduling Questions
Straight answers about intumescent fireproofing in Toronto: cost, timing, products and scheduling.
What is intumescent fireproofing?
Intumescent fireproofing is a thin coating applied to structural steel. In a fire, it expands many times its thickness into an insulating char that slows the steel from reaching failure temperature, giving occupants and firefighters time. Unlike spray-applied cementitious fireproofing, it looks like paint, so steel can stay exposed.
How much does intumescent fireproofing cost in Toronto?
Intumescent fireproofing in Toronto runs $8-$25/sqft + HST. A 1-hour rating on light sections sits near the low end; 2 and 3-hour ratings on heavy sections need much thicker builds and sit higher. Blast prep, access and decorative topcoats also affect the price.
What ratings can you achieve?
Listed intumescent systems commonly achieve 1, 2 and in some cases 3-hour fire endurance ratings, depending on the product, the steel section factor and the applied dry film thickness. Your designer or fire engineer sets the required rating and thickness schedule.
Which standards apply in Ontario?
In Canada, fire resistance of assemblies is tested to ULC S101, and many products also carry UL 263 listings. The required rating comes from the Ontario Building Code and your design documents. We apply the listed system to the specified thickness.
How is thickness checked?
Wet film thickness is measured during application, and dry film thickness is measured with a gauge after cure on every member, at the frequency your spec requires. Readings are logged and handed to the inspector.
Can intumescent coatings be painted over?
Yes, with a compatible topcoat approved by the manufacturer. Topcoats protect the intumescent layer and give a decorative colour. Incompatible paints can affect performance, so we only use approved topcoats.
Is surface prep required?
Yes. Steel must be clean and primed with a compatible primer. Rusted or mill-scale steel is usually blasted to an SSPC standard before priming.
Related Commercial Painting Services
Services often booked with intumescent fireproofing, on the same schedule and the same fixed-price quote.
Factory & Industrial Painting
Plant shutdown painting, CFIA food-grade, intumescent fireproofing, epoxy floors.
View serviceIndustrial Sandblasting
Dustless, soda and abrasive blasting to strip coatings and profile steel and concrete.
View serviceWarehouse Painting
Walls, ceiling decks, floor epoxy, line marking around 24/7 dock traffic.
View serviceIntumescent Fireproofing Near You
Areas where our intumescent fireproofing crews work most often.
Ready to Book Intumescent Fireproofing?
Fixed-price written quote, after-hours crews and full compliance paperwork for intumescent fireproofing anywhere in the GTA.
- Fixed-price written quote
- After-hours by default
- WSIB + $5M liability + $2M pollution
Get a Fixed-Price Intumescent Quote
Free site walkthrough. Estimator reply within 2 business hours.